January 2, 2014, Discovery Science Center Addition construction has began. In 2008, as architect, theatre consultant and acoustician, we started to design this 70,000 sq. ft. addition to the existing center containing a food court, exhibit spaces, 500-seat flexible black box theatre
April 5, 2014, Ribbon Cutting for Garfield High School New Auditorium. May 20, 2007, Garfield High School suffered the loss of their auditorium due to a fire. The damage was so great that the main administration building also had to be replaced
Barstow Community College broke ground on their 750-seat Performing Arts Center in October 2010. We are the associated design architect, theatre consultant, and acoustician
The new Pacific Ballroom at the Long Beach Arena is a fully customizable space. Thanks to the flying tension grid which is suspended above the 45,000-square-foot arena floor, the ceiling can be adjusted to provide the perfect