April 5, 2014, Ribbon Cutting for Garfield High School New Auditorium. May 20, 2007, Garfield High School suffered the loss of their auditorium due to a fire. The damage was so great that the main administration building also had to be replaced
Barstow Community College broke ground on their 750-seat Performing Arts Center in October 2010. We are the associated design architect, theatre consultant, and acoustician
The new Pacific Ballroom at the Long Beach Arena is a fully customizable space. Thanks to the flying tension grid which is suspended above the 45,000-square-foot arena floor, the ceiling can be adjusted to provide the perfect